หน้าหลักProcurement and SuppliesAnnual procurement and contracting plan or procurement planAsphalt concrete road surface repair and reconstruction project, route number: National Road 135-02, from Ban Nong Krala to Village No. 11, Phuchang Luang, width 6.00 meters, length 135.00 meters, average thickness 0.05 meters, or with a minimum shoulder area of 810.00 square meters.
Asphalt concrete road surface repair and reconstruction project, route number: National Road 135-02, from Ban Nong Krala to Village No. 11, Phuchang Luang, width 6.00 meters, length 135.00 meters, average thickness 0.05 meters, or with a minimum shoulder area of 810.00 square meters.